We will be bidding out the following substations for tree trimming and vegetation management, HMT (52.83 miles); BAY (12.29 miles ) AND MOU (31.44 miles). This contract will be a per mile cost also known as mileage. We will have a total of 96.56 miles of overhead line miles.
RFP Owner: Ty'Quan Glaze
Issue Date: 5/5/2025
Pre-Bid Meeting (Mandatory): 5/19/2025 @ 10:00 AM EST
Due Date: 6/3/2025 @ 2:00 PM EST
EPB is replacing HPE/Aruba core network switches at our downtown MLK facility that are EOL and no longer supported and all of of our wireless infrastructure that is currently EOS covering all EPB campuses. Please also include any and all mounting hardware that will be needed. Bids are invited for the purchase of direct HPE/Aruba upgraded model.
RFP Owner: Jaime Shelton
Issue Date: 5/4/2025
Due Date: 5/20/2025
Install 18 level 2 EV chargers on the second floor of the 1 W MLK EPB parking garage.
(THIS IS A RE-BID OF RFP 15946)
(REQUESTING BEST AND FINAL PRICING FOR A JULY 1ST COMPLETION AND A NO EXPEDITED MATERIAL AND LABOR PRICE)
RFP Owner: Jaime Shelton
Issue Date: 4/27/2025
Due Date: 5/6/2025
EPB is seeking bids for the following 600V wire and connectors: 14,040ft of 750kcmil CU, THHN 2,340ft of 250kcmil CU, THHN 218 2-hole 750kcmil compression lugs 38 2-hole 250kcmil compression lugs
RFP Owner: Ty'Quan Glaze
Issue Date: 4/28/2025
Due Date: 5/9/2025
EPB is seeking a qualified contractor to provide construction services to build a new 161/12kV substation on Aetna Mountain near Haletown, TN. This will include foundations, conduit/trench, wire/cable, control building construction, stone surfacing, ground grid, fencing, as well as structure and equipment installation.
EPB will hold a Mandatory pre-bid meeting on April 28, 2025, at 11:00 AM EASTERN at the substation project site located at 4100 Aetna Mountain Road, Whiteside TN, 37396. Bidders may initially gather at 11009 US-41, Guild, TN 37340 at 10:30 AM EASTERN to be escorted up the mountain to the project site. If bidders opt to forgo this initial gathering, it will be their responsibility to navigate to the project site.
RFP Owner: Ken Jones
Issue Date: 4/21/2025
Pre-Bid Meeting: 4/28/2025 @ 11:00 AM EST
Due Date: 5/21/2025 @ 2:00 PM EST
EPB is seeking bids for the following 600V wire and connectors: 7,560ft of 750kcmil CU, THHN, 1,260ft of 250kcmil CU, THHN, 128 2-hole 750kcmil compression lugs,23 2-hole 250kcmil compression lugs
RFP Owner: Ty'Quan Glaze
Issue Date: 4/21/2025
Due Date: 4/29/2025 @ 2:00 PM EST
EPB Brainerd Branch Building Renovations and Fire Damage Repair per Specifications.
RFP Owner: Jaime Shelton
Issue Date: 4/13/2025
Pre-Bid Meeting: 4/23/2025 @ 9:00 AM EST (at 830 Eastgate Loop Chattanooga, TN 37411)
Due Date: 5/1/2025 by @ 2:00 PM EST
Electric Power Board – Chattanooga (EPB) is seeking quotes from qualified electrical contractors for the secondary electrical work necessary to support the installation of Electric Vehicle (EV) chargers at EPB’s customer sites. The contractor will be responsible for all materials, excluding the EV chargers themselves, which will be provided by EPB. The total number of sites are four (4).
RFP Owner: Jaime Shelton
Issue Date: 4/13/2025
Due Date: 4/30/2025
EPB is looking for a fleet telematics solution that includes hardware, software, optional installation, on site training, and support costs. This would be a hosted cloud- based dashboard, we will provide a list of all tracked assets.
RFP Owner: Jaime Shelton
Issue Date: 3/31/2025
Pre-Bid Meeting (Optional): 4/10/2025
Due Date: 4/30/2025
INSTALLING AND MAINTAINING UNDERGROUND LINES (ELECTRICAL CONTRACTORS LICENSE REQUIRED)
RFP Owner: Ty'Quan Glaze
Issue Date: 5/5/2025
Pre-Bid Meeting (Optional): 5/19/2025 @ 10:00 AM EST
Due Date: 5/30/2025 @ 2:00 PM EST
RPF to purchase two Cisco M7 100G-capable servers for our Speed Test environments at FAL and COP.
This purchase is part of our hardware plan to ensure our environment remains on supported hardware, replacing the outdated and unsupported Cisco M4 servers. Upgrading to the M7 will not only eliminate unsupported equipment but also provide long-term operational stability.
RFP Owner: Ty'Quan Glaze
Issue Date: 3/31/2025
Due Date: 4/25/2025 @ 2:00 PM EST
EPB is requesting information on UPS systems to explore solutions that will benefit our commercial customers. This request is for informational purposes only, as we seek to better understand the available products and pricing. Vendors are invited to provide details on their offerings, including specifications and cost considerations, to help us assess potential options.
RFI Owner: Ken Jones
Issue Date: 4/6/2025
Due Date: 4/30/2025 @ 2:00 PM EST