EPB is requesting bids for multiple Overhead Line Construction Crews with equipment to work daily on EPB electric system. Includes multiple shifts (M-TH, Tue-Fri, 2nd shift M-TH, and TH-Sun) and storm response. Must be capable of working 4KV and 12KV distribution energized, and 46KV sub-transmission as necessary.
RFP Owner: Ty'Quan Glaze
Issue Date: 12/5/2023
Pre-bid Date: 12/12/2023
Due Date: 12/21/2023
Fire Suppression Bi-Annual Inspections
RFP Owner: Jaime Shelton
Issue Date: 12/17/2023
Pre-bid Date: 1/11/2024
Due Date: 1/24/2024
EPB is interested in a solution to provide an estimated 370TB of immutable copies of usiness critical data that can be recovered in a desired RTO of 1 hour for all systems.
RFP Owner: Edith Snider
Issue Date: 11/27/2023
Pre-bid Date: 12/6/2023
Due Date: 1/12/2024
Contractor shall furnish supervision, labor, tool and materials required to perform home energy jobs as assigned by EPB.
RFP Owner: Jaime Shelton
Issue Date: 11/19/2023
Due Date: 12/8/2023
EPB is seeking a wholistic solution to replace an existing set if tools used for Network monitoring. In addition, EPB requires a Service Assurance solution to provide select customers with network performance/availability metrics.
RFP Owner: Jaime Shelton
Issue Date: 11/21/2023
Pre-bid Date: 12/4/2023
Due Date: 1/18/2024
12 Month Juniper Support Renewal
RFP Owner: Jaime Shelton
Issue Date: 11/19/2023
Due Date: 12/4/2023
Audit all Street and Private lights on EPB's system. See attached file for specifications.
RFP Owner: Edith Snider
Issue Date: 11/19/2023
Pre-bid Date: 12/4/2023
Due Date: 12/14/2023
Renovate OC3 with new nap rooms and 3 offices.
RFP Owner: Jaime Shelton
Issue Date: 11/12/2023
Pre-bid Date: 11/29/2023
Due Date: 12/7/2024
Existing links between COP-ATL-ASH-COP are either coming out of contract, or will soon be out of contract, so it is time to re-rfp these solutions. We also need to increase bandwidth on these paths.
RFP Owner: Jaime Shelton
Issue Date: 10/29/2023
Due Date: 1/3/2024
Installation and Equipment for new Aetna Mountain Fiber super node DC Power Plant.
RFP Owner: Edith Snider
Issue Date: 11/04/2023
Pre-bid Date: 11/07/2023
Due Date: 12/13/2023
EPB is issuing an invitation for one or more qualified implementers to undertake the development of a User Interface within Salesforce Experience Cloud and/or the implementation of Oracle's Warehouse Management Enterprise Cloud Service. The Request for Proposal (RFP) will be divided into two distinct sections. Proposers have the flexibility to submit proposals for each section separately or for both sections collectively. Each section should have a separate cost estimated detailing your proposal. If this proposal is awarded to two different implementors, each implementor must work in collaboration with the other and EPB Personnel.
RFP Owner: Edith Snider
Issue Date: 10/24/2023
Pre-bid Date: 11/07/2023
Due Date: 12/05/2023